Root Cause Analysis
As Government institute at Agra, Uttar Pradesh was facing electricity problems & was spending lots of money on electricity bills. Their load was around 100 KW. They wanted to maximize the available solar energy to run their office loads and save on electricity bills.
As Government institute at Agra, Uttar Pradesh was facing electricity problems & was spending lots of money on electricity bills. Their load was around 100 KW. They wanted to maximize the available solar energy to run their office loads and save on electricity bills.
Analyzing their requirement we suggested a 250 kVA Solar Hybrid Inverter. The 450 nos. panels (20×22, 335 watts) and 200 Ah, 600V (300x) batteries capacity will be added to boost up the power to 250 KW.
With the above solution, customers will get a return on investment after 4yrs. And he will enjoy free electricity for the next 15 + years.
Really appreciate the Government Organization from Agra for switching to a solar Hybrid Inverter while others still struggling with low power available for consumption in the Uttar Pradesh region.
Site Installation Date | 30 Nov 2021 |
Inverter Rating | 250 kVA |
PV Capacity | 150 kW |
Battery Volt | 600VDC |